View allProduct
View allHOT News
-
The demand for reliable materials in cryogenic service applications has increased significantly with the rapid growth of LNG terminals, industrial gas storage facilities, and low-temperature pressure vessels.2026-06-24
-
As the global demand for liquefied natural gas (LNG) continues to grow, the need for reliable materials for cryogenic storage systems has become increasingly important.2026-06-18
-
For engineers specifying materials for cryogenic pressure vessels, finding the balance between strength and ductility at sub-zero temperatures is challenging.2026-06-12
-
In industries where equipment must operate reliably under freezing or cryogenic conditions, material selection becomes a matter of safety and structural integrity.2026-06-01
-
While both ASTM A203 Grade B and ASTM A106 Grade B serve critical roles in industrial applications, they are fundamentally different in composition, purpose, and performance.2026-06-01
Need advice, or a quote?
SPV 355 steel plate size,SPV 355 steel chemical composition
SPV 355 steel plate is a kind of material which is mainly used for boiler and pressure vessel steel. As a professional SPV 355 steel plate supplier, we promise we will supply you the quality SPV 355 steel plate.
SPV 355 steel plate has good weldability, it is characterized by a minimum yield strength of 280-355 MPa.
SPV 355 steel plate size:
Grade: SPV 355 Standard: JIS 3115
Thickness: 8-350mm, width:1000-4020mm, length:3000-27000mm
SPV 355 steel chemical composition:
|
Grade |
Chemical Composition(%) |
||||
|
C Max |
Si Max |
Mn Max |
P Max |
S Max |
|
|
SPV355 |
0.20 |
0.55 |
1.6 |
0.030 |
0.030 |
|
Grade |
Mechanical Property |
|||
|
Tensile Strength(MPa) |
Yield Strength(MPa) |
% Elongation in 2 in.(50mm) min |
Impacting Test Temperature(°C) |
|
|
SPV355 |
520-640 |
315-355 |
14 |
0,-10,-20 |
SPV 355 steel plate application:
SPV 355 steel plate is mainly used to manufacture boilers and vessels which often worked in harsh environment, high pressure, this environment requirements on steel is relatively high.
SPV 355 Steel Services: Cutting, Painting, Ball blast, Pretreatment , and The third party inspection in DNV, BV, LR, GL, ABS, CCS , CE Mark, TUV, ISO, and others in super thick ship steel plate.
Payment form: T/T, L/C
Trading term: FOB, CIF, CFR
Delivery look at the situation: Spot 1-3 days, Futures 25 days(Our delivery date will be must faster according to your requirement).
Any need in SP V355 steel plate, please feel free to contact us, we will reply you as soon as possible.

